.jpeg/:/rs=w:1200,m)
Rehabilitation of the 63mm inlets lower basin supply line using an advanced trenchless method combining CIPP and epoxy lining — world's tallest building.
Client: Burj Khalifa LLC · Location: United Arab Emirates ·
Robotic crawler cameras map every meter of the line — cracks, joints, corrosion and blockages located to the centimeter.
The host pipe is jet-cleaned and prepared, restoring the full internal diameter before lining begins.
A resin-saturated liner is inverted or winched through the existing pipe — through manholes, no trenches.
The liner is cured into a structural pipe-within-a-pipe, CCTV-verified and certified with a 10-year warranty.

