Applied Pipeline ServicesApplied Pipeline ServicesUAE · KSA · QATAR← Back to site
King Salman International Complex for Maritime Industries — project site
Case Study · Saudi Arabia

King Salman International Complex for Maritime Industries

Saudi ArabiaRas Al KhairCIPP · ARAMCO
CIPP LiningUsed here
CCTV InspectionUsed here
10-Year Structural WarrantyApplied standard
Project Scope

Inspection and rehabilitation of pipes of various sizes using CIPP technology — in partnership with ARAMCO and SEPCO at the world's largest maritime complex.

Client: King Salman International Complex for Maritime Industries · Location: Saudi Arabia ·

How We Did It

Trenchless — no excavation, no downtime.

01

CCTV Survey

Robotic crawler cameras map every meter of the line — cracks, joints, corrosion and blockages located to the centimeter.

Used here
02

High-Pressure Cleaning

The host pipe is jet-cleaned and prepared, restoring the full internal diameter before lining begins.

Used here
03

Liner Installation

A resin-saturated liner is inverted or winched through the existing pipe — through manholes, no trenches.

Used here
04

Curing & Certification

The liner is cured into a structural pipe-within-a-pipe, CCTV-verified and certified with a 10-year warranty.

Used here
Inside the Rehabilitated Pipe

A structural pipe within the old one.

1Old damaged pipe
2Adhesive bond layer
3Fiber reinforced layer
4Resin liner — cured in place
5New structural pipe
More landmark projects

All projects →

Facing a similar pipeline challenge?