Saudi ArabiaRiyadhCIPP Lining
0mmmm diameter
0mmmm diameter
CIPP LiningUsed here
10-Year Structural WarrantyApplied standard
Project Scope

High pressure CIPP to rectify DN65 & DN100 UPVC drainpipe under foundation in Riyadh — precision small-bore rehabilitation.

Client: ENOVA · Location: Saudi Arabia ·

How We Did It

Trenchless — no excavation, no downtime.

01

CCTV Survey

Robotic crawler cameras map every meter of the line — cracks, joints, corrosion and blockages located to the centimeter.

02

High-Pressure Cleaning

The host pipe is jet-cleaned and prepared, restoring the full internal diameter before lining begins.

03

Liner Installation

A resin-saturated liner is inverted or winched through the existing pipe — through manholes, no trenches.

Used here
04

Curing & Certification

The liner is cured into a structural pipe-within-a-pipe, CCTV-verified and certified with a 10-year warranty.

Used here
Inside the Rehabilitated Pipe

A structural pipe within the old one.

1Old damaged pipe
2Adhesive bond layer
3Fiber reinforced layer
4Resin liner — cured in place